From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 12:02 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Mesadak Ezzat-Agha 

Last updated:  03/13/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


West Linn, OR  97068
US

Mobile: 503-501-8523   
mezzatagha@hotmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Mesadak Ezzat-Agha - Scheduler

Resume Value: xpy5mx4qf9m7z8fk   

  

 

Mesadak Ezzat Agha

Project Controls/ Senior Scheduler

                                

  Experience Summary (General)

 

Following up the Pre-Construction Services Phase, and work closely with all project team members involving the design, constructability, cost estimate, and subcontracted work into a detailed Construction Schedule.

Prepares and updates cash flow projections, combining the cash flow and earned value and track the real status of the progress and detects early cost deviations.

Review and prepare independent cost estimates for subcontract change orders and review

Contract documents and modifications to determine scope of work and equitable cost allowance of scope change.

Prepare the majority of the construction management team’s monthly summary reports.

Experience in Engineering, Procurement and Construction (EPC) project and coordinate procurement processes for Labor, material delivery, equipment, services, schedule construction, and drive completion to meet schedule and budget expectations.

 

Experience Summary (Technical))

 

Create and develop projects Schedule into P6 Master Schedule and reporting tools for the projects life cycle. Update information into Master Schedule and perform the report updated and post the reports and schedule to the web portal for viewing for the management of the projects on monthly basic.

Prepare Work Breakdown Structure WBS and logical sequence of activities for accomplishing project, and establish the capital cost budget from the estimate in accordance with the project WBS.

Review and analysis of the baseline schedule, and monthly update schedules, monitoring and evaluating the actual physical progress of the work to assure that the general contractor is performing the work in accordance with their schedule.

Review, develop, analyze and updated details project schedule for logic, duration changes, milestone changes, etc.

Review and develop detailed project schedule using specialized Critical Path Method CPM analysis, and perform schedule variance analysis.

Work closely with all engineering and construction issues and conflicts that impact the schedule and perform Time Impact Analysis (TIA) for delay analysis.

Create recovery and mitigation schedule, and perform “What-if” scenarios.

 

Partial list of clients: DALLAH Group Company, AT & T- Lucent Technologies (LTII), Royal Commission for JUBAIL and YANBU,  Bureau of Environmental Services City of Portland Oregon, SFMTA, Rio Tinto (RTIO), City of New York, Washington Suburban Sanitary Commission (WSSC), DOD (The Pentagon),  PG&E.

 

Project Experience:

 

Scheduler

ARCADIS U. S. Inc.,

San Francesco Bay Area                                                        March 9, 2015 to present

 

The Program & Construction Management (PM/CM) division had operated and work closely with under the ARCADIS Infrastructure and Environmental divisions to pursue and execute work. ARCADIS leverages an in-depth understanding of how facilities are designed to integrate effective PMCM practices into the full life cycle of a project.

The ARCADIS U. S. Inc. has been selected by Pacific Gas & Electric (PG & E) to perform projects and construction management services for the implementation and to provide the overall coordination, planning and management necessary to control project cost, schedule and quality from the initial needs through project closeout.

Projects:   1- The Topock Compressor Station is located in Needles, California.

                 2- The Hinkley Compressor Station is located in Hinkley, California.

 

 

 

RESPONSIBILITY

 

To provide cost control, scheduling, and claims support for PG & E Chromium Program Management Office (PMO) capital projects and as of staff scheduler of a cost Controls Team, my responsibility to share in the develop program schedules for PG &  E Capital Project for all types of construction, procurement, sequences of work, and construction means and methods

 

1.                        Supports producing program monthly schedule updates and management reports to

communicate effectively with executives and contractors  (Vendor’s Responsible), managers (Operation Managers), and clients (PG & E).

2.                        Adding the approved Subcontractor Work Authorization SWAs commandment (New Buys -NBs) line items (or commitment task) activities and update the approved  change Orders (SCOs) in the Master Program Schedule (MPS) in Oracle Primavera P6 for each monthly cycle

3.                        Update and planned, monitored and status on the each cycle monthly basis and each in

        progress SWA commitment line item activity as well as required progress percentage

       complete.

4.                        After all the monthly reviewers markups have been updated in the MPS and new

        activities have been incorporated, I have to prepare the MPS for submission to all

       PG & E concerned leadership by the first working day of the month.

5.                         Prepare a backup of MPS for new Cycle update, by create a reflection of the previous month’s data as backup.

 

Duties include project cost control and monitoring, cost reporting, variance analysis, force account review and analysis, claims analysis, and change order tracking. To supporting Cost Analyst(s) and assist Program Cost Control Manager.

 

 

1.                        Coordinating the processing of change orders and purchase requisitions including the assembly of supporting documentation, preparation of file maintenance and monitoring and tracking of approval process. 

2.                        Maintaining consultant and contractual invoice control, including log and invoice review for accuracy; coordinate necessary approvals, maintains record of expenditures by contract, and monitor entry of data into financial system.

 

 

    Senior Analysts/ Scheduler

                                                                                                    September 23, 2013 to January 23, 2015

 PARSONS - Parsons Government Services (PGS)

 

Federal Program and Construction Management Projects

FSD - Project Control Division (PCD)

Location: Pentagon Renovation Program. Washington D.C.

Parsons have been more than 10 years of onsite PM/CM support during all phases of renovation for diverse facility types

At the project’s peak, Parsons’ onsite staff included more than 200 project managers, engineers, cost estimators, schedulers, and construction inspectors.

Responsibilities are includes:

 

1.       Prepares an integrated master schedule (IMS) for all ongoing

              Design/Build and or Design/ Bid/ Build projects.

2.       Supports the Project Controls Division (PCD) which provides a broad

              array of construction management services to the Pentagon Reservation and

             RRMC.

3.       Provide preliminary schedules for source selection and contract durations during acquisition phase. Provided scheduling support services during the strategic planning, mission analysis and project development phase.

4.    Integrate Master Schedules (IMS) of approx. 100 funded projects for

              Engineering Construction Management (ECM) across EAD, CMD, and PCD.

5.    Evaluation and analysis of building infrastructure requirements, to Include but are not limited to developing staff papers, (e.g. issue papers  w/ report, options and recommendations), draft policies and procedures, SOWs, correspondence, tracking logs and spreadsheets. Efforts include: evaluation and integration

of system requirements, development of technical statements of work and technical requirements for studies and analysis.

6.                    Supports PCD in the Performance Execution Metrics Reports and Schedule analysis and

forecasting for in progress projects, required for the higher Management.

7.                    Lead a team of Schedulers supporting a Design/Build and or Design/ Bid/ Build

                                                          projects to Pentagon Renovation Program using Primavera P6 and MS Project.

8.                    Developing Statement of Work (SOW): Assist Engineering Controls Management (ECM)

               Project Teams with the preparation of Statement of Work (SOW) to establish

contractual

              submission timeline for initial schedules, baseline, and monthly reports.

9.    Prepares schedules for construction project, AE studies, or maintenance work once SOW requirements are defined, for used in determining period of                                                performance (POP) that is then include in the solicitation; and for any contract

change order.

10. Developing level and baseline construction schedules and tracking actual work

 progress using Primavera P6 software.

11. Reviews all schedule submission received from the contractors and provides recommendations and comments to the Contracting Officer Representative

                                          (COR) and Construction Manager for acceptance of each submission.

                                  12.  Provide expertise in the areas of project controls, scheduling, and earned value

                                          management, and construction activity. Reviews the invoice requirements to

                                          ensure that they are accurate according to Budgeted    Cost, Actual Cost, and

                                        Earned Value (calculated based on Physical Percent Complete Setting).

                                                   13. Reviews change order request for impacts to the schedule.

                                                   14. Develops, maintains and monitors Critical Path activities, provide

                                                        Critical Path analysis and provides “alerts” on items impact schedule.

                                                    15. Analyzes project planning and schedule update, as well as delays.

                                                    16. T rack government and contractor delays, stated or implied, for schedule

                                                          impacts and potential claim resolution.

 

.

Project Scheduler Specialist

                                                                              February 25, 2013 to June 28, 2013

Louis Berger Group, Inc.

For Washington Suburban Sanitary Commission WSSC

Location: Baltimore, MA

 

WSSC is the 8th largest water and wastewater utility in the nation, with a network of

more than 5,500 miles of fresh water pipeline and nearly 5,400 miles of sewer pipeline.

The majority of Louis Berger Water Service LBWS’ new work is taking place in Baltimore and includes designing a water main, managing a sanitary sewer overflow Consent Decree Program and providing construction management services for the city.

LBWS is also managing a sanitary sewer overflow consent decree program for Baltimore County.

Working with LBWS to develop a P6 Master Schedule and Reporting tool for

Consent Decree, in WSSC Laurel, Maryland. Primavera P6 Master Schedule

 Implementing various rehabilitation programs that will extend the useful life of

 the aging sewer system in multiple locations in Montgomery and Prince George’s Counties    by renewing its sewer pipes.

 

Responsibilities on this project includes to the P6 master schedule, providing schedule maintenance, predicting cash flow along the programs lifecycles, producing monthly progress reports. Developed user manuals and direction for the step by step on Primavera P6 software. This project Involve a huge schedule structure with more than 11,000 activities.

 

Infrastructure Systems Group (ISG) management in WSSC Laurel,

Maryland for the following projects:

a. Water Main and Sewer Relocation Unit team (40 projects).

                                                  b. Water Analysis Unit (55 projects to renew the service life of water main).

                                                 c. Water Rehabilitation Unit (190 projects for meter vault replacement).

 

LBWS developed a web portal inside the WSSC firewall for the posting of all schedules and reports for viewing by the team. To do so we did the following steps:

Prepare template with related definitions and logic/relationships for all tasks

in the project life cycle.

 

1. Create project codes and related Values in P6 Web, activity codes and load related information for the projects into the schedule.

                                 2. Budget and Cost Loaded data project by project.

3. Assign baseline schedules for each project in the Master Schedule.

4. Meet WSSC PMs to update each project and develop the status reports of Primavera P6 layouts and Graph/ Excel.

5. Generate the required reports based on the update schedule.

 

Some tasks to be update on monthly basis, the LBWS scheduler shall post the

updated schedules and status reports to the WSSC web portal for viewing by Project Managers and Management Team.

 

 

                                                   Project Controls Scheduler

                                                                           December 1, 2012 to February 1, 2013

                                     CB & I (Shaw Group Inc.)

                                     Project: Rapid Repair Program City of New York, NY, USA.

 

Project Controls Schedule for the NYC RRP project (Hurricane Sandy Recovery Program), which includes the following responsibilities:

   1. Initiate the Baseline Schedule by blocks/Zone level.

   2. Review and updated the three Week Lock Ahead schedule daily.

   3. Report any major changes to the in progress and not yet start blocks.

   4. Coordinate with the Contractor Scheduler to review and revised any inconvenient data and to

      monitor the progress closely and to maintain accurate data input.

   5. Scope Updates/Review.

   6. Critical Issues.

                                                        7. Attend daily meeting to discuss (Daily performance for active blocks,

                                       Availability of work Orders in Scheduled Blocks, and High priority status

 

 

Scheduler

                                                                                                    July 19, 2012 to October 26, 2012

 AECOM Canada, Ltd.                                                                                                                                                                  

 Simandou Iron Ore Project-Rail Road.

Location: Toronto, Canada

 

 The AECOM Simandou Project is comprised of two principle components:

 A 650 km-long Trans-Guinean railway to transport iron ore from the mine to the coast.

Rio Tinto (RTIO) contracted the engineering services to Fluor as an EPCM contract with AECOM as a sub-consultant. AECOM is providing the engineering services for the rail and port components which are expected to account for half of the Project’s total cost.

The Simandou Project will be the largest integrated iron ore mine and infrastructure Project ever developed in Africa.

                                                       I work with AECOM Scheduling Team to Update a Master schedule of

Deliverables and services which are include:                                       

1.            Monthly Level Schedule Update: the Level 1, Level 2 and Level 3 Project Schedules will                                                 be updated and issued monthly, and impact of the changes for that reporting period.

2.   “3-week look-ahead schedule” will be reviewed in the Project Weekly Status   meeting.  And weekly progress summaries.                                        

3.   Develop a Level 4 Schedule for the Simandou Project life cycles as follows:

Stage 1 – Conceptual and Order of Magnitude,

Stage 2 – Preliminary Engineering Assessment (PEA)

Stage 3 – Derivable of Definitive Engineering (DE)

Stage 4 – Derivable of Details Design (DD)

Stage 5 – Construction (with testing and commissioning and 1st year Operation)

 

Scheduler/ Cost Controls Engineer                                                                      

                                                                          November 28, 2005 to January 23, 2012

                                                                                                                                                                              

EPC Consultants, Inc. San Francisco, CA for Bureau of Environmental Services

Location: City of Portland; Portland, Oregon.                                                                                                                                                           

Willamette River Combined Sewer Overflows CSO Tunnel Program.

 

1- The East Side CSO ESCSO Tunnel, Portland, OR, $450 million, 2005-2011
The projects used Cost-Reimbursable-Fixed-Fee. This alternate contract method successfully eliminated all claims and disputes for both projects. The entire program was completed on-time and under-budget with no outstanding contractual issues and no claims.


The project contains 6 miles of 22-ft diameter sewage conveyance/storage tunnel that will collect and intercept overflows from existing combined sewers and carry sewage and storm water to Swan Island Pump, and 6,000 linear feet of small diameter tunnels and gravity open-cut pipeline. The Eastside CSO tunnel constructed 85 to 165 feet below ground and 7 separate large shafts located along the alignment to very difficult connections to live sewers.


2-  Swan Island Pump Station Phase 2 $9 million, 2009-2011
Project Estimator/Project Controls Scheduler: Second phase of construction for the 210 MGD underground Swan Island Pump Station installing 3 large pumps, motors, VFDs, and the associated piping, and mechanical and electrical equipment necessary to complete the pump station.

 

3- The Portsmouth Force Main project is the last leg of the CSO Program and will convey up to 120 mgd of combined sewage through one 66-inch diameter force main.  Beginning at the Swan Island Combined Sewer Overflow Pump Station, the Portsmouth Force Main Segment 1 and 2 extends 11000 lf of micro-tunneled pipeline to the Columbia Blvd Wastewater Treatment Plant.

 

All of these contracts have had schedule issues and claims related to time and extended overhead.  Responsibilities include Preparation the estimating for the changes on the subcontracts on the ESCSO and attend and participate in all of our negotiations for the Pump Station.  

Responsibilities include review and analysis of the baseline schedule, as-built and monthly update schedules, monitoring and evaluating physical progress to assure that the general contractor is performing the work in accordance with its schedule. Review the project schedule each month for the ESCSO.  The project has had numerous schedule evaluations to adjust for seasonal weather issues and major equipment deliveries and such.  The consequence is that the team has managed the project to meet the contract time milestones successfully.

Prepare the monthly summary report, which includes the updated schedule, summary of construction, city forces, progress photos, schedule issues, cash flow, cost event summary and contingency expenditures against the cost to date.

In addition, the responsibility of reviewing subcontract change orders, and provides independent projection comparison of the schedule estimate at completion to the general contractor’s. Several of these changes required schedule analyses of the subcontract durations.

Utilize report and preparation of charts & graphs to support and present analyses for project controls and evaluation. 

 

Scheduler/ Cost Controls Engineer

                                                                                                                                                                                                                                                            

M & M Company Ltd.                                                    April, 2002 to July, 2005

Location: Riyadh, Saudi Arabia                      

                                                      Al-BILAD compound project which consists of site development/utilities infrastructure and

                                                      construction of 34 villas at JUBAIL Industrial City of Royal Commission for JUBAIL and YANBU.                                                          

               Responsibilities of Scheduler engineer and cost control to producing various reports, creating, integrating and maintaining schedules by Primavera P3 and Prepare cost estimate.

 

Senior Lead Engineer

El Seif Engineering Contracting Est., Riyadh, KSA            2000 to 2001

 

Kingdom Tower Project, Riyadh                                                

Responsibilities as the Senior Lead Engineer for Levels 1, 2, 3 and 4 of the East Podium included following up all structural, architectural and finishing works to assure that work progress was completed in accordance with the CPM master schedule. Notify the project manager of any issues/obstacles revealing a potential work delay to assure schedule mitigation, complete with a sample mock-up.  Reviewed and studied all shop drawing/details and responsibility for inspection, RFIs and coordination with QA/QC consultants.  The Kingdom Tower Project was a $1B multistoried structure managed by Bechtel Company, USA and designed by Ellerbe Becket, the Netherland.

 

Project Controls Assistant Manager and Regional Construction Manager

                                                                               August, 1998 to October, 1999

 

National Telecommunication Co. Ltd., Riyadh, Saudi Arabia                                                                                                                                   

Main Contractor: AT & T - Lucent Technologies (LTII), USA.

ASB-TEP6-TEN- SC-386 Telephone System Project- Saudi Telecommunication Company STC.                                                               

 

As Project Controls Deputy Manager, responsibilities included the direct supervision of the technical staff in handling planning and scheduling (Primavera Project Planner P3), pricing and budgeting section, cost proposals section, production monitoring section, and the document control section.  The project consisted of the completion of a section of a contract installing a new telephone system in Saudi Arabia linking Makah, Medina, Hail, Jeddah and Riyadh with laying the cables for the new System out Site Plant (OSP) being the main task. 

As Regional Construction Manager on the $500M project, responsibilities included communication with client, reporting to operation manager & project control center, providing information & support required to coordinate with government departments, defining work requirements and assuring that all work was completed in conformance with project specifications as well as with the standards of the local agencies.  Responsibilities also, include organizing test performed by the quality control testing laboratories, follow up work orders/letters of intent, pre-construction surveying & route layout for each work order, submitting for new permits from local municipalities, test pits, site diary and flimsy, red line drawings and incorporation into the PAT binders, and implementation of safety procedures.

 

 

 

 

 

Assistant Resident Engineer

Associate Consultant Engineer (ACE): Headquarters in Beirut, Lebanon and London, UK                                                    

                                                                    January 1995 to July 1998

 

                                      Jeddah Tourist City Project (DURRAT-Al ARUS)-One Billion SR

                                     DALLAH Group Company.

                                     Location: Jeddah, Saudi Arabia

Project Description: Roads(30km), underground utilities, Earth works and Road, Sanitary Sewer, Storm drainage and Potable/ Fire) system Telecommunication System, Structure and Finishing works for (Marina, Floating stage, Port Apartment, Boat exhibition, Civic Center and Golf Course).

Responsibility includes supervision of the staff (Site engineer, inspector, QS Quantity). Manage and assure the quality of work Executed, lead inspection and testing procedure, and review the setting out and other surveying works, and checking of installation / application procedure. Test, examine and approve any material or equipment to be installed/ used in or for the works performed by onsite laboratory testing. Review, prepare and approve shop drawings and as built drawing, Maintenance and operation manuals. Assure that works are executed in conformity with drawings, specifications and other contract documents. Check materials to be sure if they are complying with approved submittals and in good condition, in compliance with the specifications or with manufacturer’s recommend.                                                                           

Mesadak Ezzat Agha - Page 1 of 7



Experience

BACK TO TOP

 

Job Title

Company

Experience

Scheduler

ARCADIS, U. S.

- Present

 

Additional Info

BACK TO TOP

 

Desired Salary/Wage:

45.00 - 50.00 USD hr

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

More than 15 Years

Date of Availability:

Within one month

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

Inactive Clearance

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Scheduler

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Industry:

Aerospace and Defense
Engineering Services

Occupation:

Engineering

·         Civil & Structural Engineering

Project/Program Management

·         Project Management

 

Target Locations:

Selected Locations:

US-OR-Portland

Relocate:

Yes

Willingness to travel:

Up to 50% travel

 

Languages:

Languages

Proficiency Level

Arabic

Fluent

English

Fluent